Hampshire, UK
Hampshire-based shentongroup celebrates a successful close to UK AD & Biogas 2015 and the installation of standby generators in a high profile London development with the release of impressive Gen Kw figures.

The Standby Power, Uninterruptible Power Supplies and Combined Heat and Power System specialist was proudly exhibiting the Tedom T30 Combined Heat and Power (CHP) unit to a number of its established customers, as well as many of the 3,500 attendees at UK AD & Biogas 2015, the anaerobic digestion and biogas industry’s largest annual event.  shentongroup is Tedom’s official UK distributor.

In addition to a successful UK AD & Biogas 2015, shentongroup has also completed the delivery and installation of a new 680kVA, 3 phase, 50Htz Standby Generator to a major tower development in London.  The Standby Generator was crane lifted into the building and skated by a shentongroup Movement Team into its final position in the development’s generator room.  The shentongroup Projects Team completed the installation of the exhaust flu and hot air ductwork, in line with project specification.  A twin-walled exhaust now exits the tower at roof-level, being 13 floors above ground.

shentongroup’s Sales and Marketing Director, Curtis Meek, explained how his company demonstrated superiority over its competitors to win this high-profile contract: “We won this project due to being able to value engineer it and carry out a very technical installation”.  He added; “We are finding more and more that our inventive ways of overcoming difficult installations is what is desperately required in the industry and this project is another example of showing that we are the UK’s leading technical experts’.

shentongroup has for 30 years provided public and private organisations advise on the supply, installation and maintenance of all aspects of critical power continuity and it supplies clients spanning a number of diverse industries including; finance, healthcare, telecoms, manufacturing, retail, education, government, utilities, and sports and leisure.  Recent figures released by shentongroup confirm that since 2012 alone, the company’s solutions have generated 55,979 Kw in energy.

Organisations wishing to learn more about Standby Power, Uninterruptible Power Supplies and Combined Heat and Power Systems, as well as G59 Testing and Commissioning should visit shentongroup’s website at www.shentongroup.co.uk.
Contact
shentongroup
Shenton House
Walworth Road
Walworth Business Park
Andover
SP10 5LH

Tel: +44 (0)844 888 444 5
Email: [email protected]
Web: www.shentongroup.co.uk